They have got all of the insulating done inside the house. They blew in a foam insulation to make it air tight and then went over it with batting insulation. The R value is supposed to be everybit as good as if we had 2x6 construction done.
I was out at the house today and the drywall had been dropped off. Our builder said that the drywall will all be hung by the end of the week and be finished by the end of next week. Hopefully the weather dries out a little so the drywall mudd will dry. Also, today the geothermal lines were being dug.